18000 NGL Storage
Internal Mag Particle Inspection August 2024
Ultrasonic Thickness Inspection August 2024
Blasted and painted White November 2024
Delta-Port Relief Manifolds
Float Gauge
85% multi-valve
2” liquid out piped to loading riser
2” Vapor piped to loading riser
Thermowell & temperature gauge
ESD
https://www.badgerequipment.ca/badg-inventory/western-rock-bit-18000/
Will be ready to work